Handbook of Mechanical Engineering Calculations 26.12: True Unit Time, Minimum Lot Size and Tool-Change Time /

This video demonstrates how to calculate the machine unit time, the most economical machine to use, the minimum lot size, and the unit tool changing time for any type of machine tool used in metalworking operations.

Saved in:
Bibliographic Details
Main Author: Mitra, Rana,
Format: Video Video
Language:English
Published: New York, N.Y. : McGraw-Hill Education LLC., c2013.
Series:McGraw-Hill's AccessEngineering.
Subjects:
Online Access:http://accessengineeringlibrary.com/browse/handbook-of-mechanical-engineering-calculations-second-edition/p2000e9d699726_18001#p2000e9d699726_18001.3
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:This video demonstrates how to calculate the machine unit time, the most economical machine to use, the minimum lot size, and the unit tool changing time for any type of machine tool used in metalworking operations.
Item Description:Title from title frames.
Physical Description:1 online resource (1 video file, approximately 5 min. 07 sec.): digital, .flv file, sound
Format:Mode of access: World Wide Web.
ISBN:9780071490399